No |
Package |
Field of Work |
Location |
Client |
Timeframe |
1. |
DPPT Jakarta Outer Ring Road (JORR) Elevated Cikunir - Ulujami |
DPPT |
Jakarta |
PT Nusantara Infrastructure Tbk |
October 2024 -On Progress |
2. |
Preparation of Dokumen Perencanaan Pengadaan Tanah (DPPT) and Feasibility Study for Kamal Reservoir Development Plan |
DPPT |
North Jakarta, DKI Jakarta |
Dinas Sumber Daya Air, DKI Jakarta |
October 2023 |
3. |
Industrial Area Master Plan – Integrated area of Malaka Strait. Master Plan Kawasan Industri, Kawasan Terpadu Selat Malaka (KTSM) |
Master Plan and Detailed engineering design of main gate |
Deli Serdang Regency, North Sumatera, Indonesia |
PT LAPI for PT Pekebunan Sungai Wang |
March 2022 -February 2023 |
4. |
Land Acquisition and Resettlement Action Plan (LARAP) Phase II Consultancy Services for Mentarang Induk Hydroelectric Project (MIHEP) |
Feasibility Study, LARAP and Survey |
Malinau, North Kalimantan |
PT Kayan Hydropower Nusantara |
February 2023 -On Progress |
5. |
Masterplan Document Preparation Work Takalar Industrial Area, KKPR and IUI Management |
Feasibility Study, KKPR and IUKI Management |
Takalar, South Sulawesi |
Masterplan Document Preparation Work Takalar Industrial Area, KKPR and IUKI Management |
November 2023 -On Progress |
6. |
Preparation of a Feasibility Study Kamal Reservoir Development Plan |
Feasibility Study |
DKI Jakarta |
Dinas Sumber Daya Air, DKI Jakarta |
June 2023 |
7. |
Consultancy Services for The Preparation of Larap Study (Land Acquisition and Resettlement Action Plan) and Land Acquisition Planning Documents, West Java, Indonesia - Matenggeng Pumped Storage 943 MW |
Feasibility Study, LARAP Survey & DPPT, Grievance Redress Mechanism (GRM), Stakeholders Engagement Plan (SEP), Environmental Permit, Environmental and Social Impact Assessment (ESIA) |
Matenggeng, Central Java |
PT PLN - Central Java Development Main Unit (UIP JBT) |
June 2023 -On Hold by PLN for reasons of finalizing the DED by PLN. |
8. |
Paket Pekerjaan Jasa Konsultansi Penyusunan Studi Kelayakan dan Survey Investigasi Desain (SID) Pelabuhan Bantaeng (KSO PT Raya Konsult) |
Feasibility Study |
Bantaeng |
PT Raya Konsult |
17 March 2023 -On Progress |
9. |
Penlok Bahodopi dan Penlok/LARAP-FEL3 (ESIA) Pomalaa & Bahodopi South Sulawesi · Bahodopi Location Determination (Penlok) · Pomalaa Location Determination (Penlok) · Preparation of Land Acquisition Planning · Documents (LARAP/FEL3/ESIA) Pomalaa |
ESIA, LARAP/FEL3 Survey, Penlok Implementation Grievance Redress Mechanism (GRM), Stakeholders Engagement Plan (SEP), Environmental Permit, |
Bahodopi, Pomalaa Sulawesi |
PT Green Crop Konsultan Indonesia – PT Vale Indonesia |
31 December 2023 -On Progress |
10. |
Socio-economic Baseline Survey for ESIA, LARAP and SEP Preparation for the Indonesia Batam-Bintan Bridge Project |
ESIA, LARAP and SEP |
Batam |
PT Bita Bina Semesta |
6 October 2022 -10 March 2023 |
11. |
Feasibility Study Rancang Bangun (Design & Build) Pelabuhan Anggrek Provinsi Gorontalo |
Feasibility Study |
Gorontalo |
PT Raya Konsult |
May 2022 |
12. |
Social Safeguard, LARAP, And Gender Responsive Analysis for Raw Water Intake and Transmission from Lau Simeme in North Sumatra Province, Jatigede, And Kertasari System in West Java Province |
Safeguard Survey |
Cirebon, Sumedang, Bandung and Medan |
Oriental Consultants Global Co., Ltd., |
July 2022 |
13. |
Construction Management Consultant Services for the Old Central Public Facilities Arrangement in Tanjung Enim (SPPH11919-1) |
Construction Management (MK) |
Muara Enim Regency, South Sumatera Province |
PT. Bukit Asam, Tbk |
March 2022 |
14. |
Preliminary Environment, Social, and Gender and Social Inclusion (ES & GSI) Due Diligence on the Proposed MCC-2 Demonstration Projects (Equator seconded to PT. Bita Enercon Engineering & IMC Worldwide) |
SSDD |
Kepri, Riau, Sumsel, Sulut, and Bali |
MCC- IMC |
July 2022 |
15. |
Preparation of AMDAL Document for ongkong Multipurpose Dam, South Sulawesi |
AMDAL |
Rongkong, South Sulawesi |
ACE Pvt. Ltd. in Joint Venture with PT. SATRIA BUMISTRATA SERVICE, PT. IKA ADYA PERKASA, PT. HILMY ANUGERAH and PT. ARIA JASA KONSULTAN |
January 2022 |
16. |
Preparation of AMDAL Document for Warsamson Multipurpose Dam, West Papua |
AMDAL |
Warsamson, West Papua |
ACE Pvt. Ltd. in Joint Venture with PT. SATRIA BUMISTRATA SERVICE, PT. IKA ADYA PERKASA, PT. HILMY ANUGERAH and PT. ARIA JASA KONSULTAN |
January 2022 |
17. |
Tourism Masterplan of Special Economic Zone (SEZ) Sawarna - Master Plan Kawasan Pariwisata Kawasan Ekonomi Khusus (KEK) Sawarna |
Feasibility Study – Master Plan, Infrastructure Plan |
Lebak Regency – Banten Province, Indonesia |
PT Parama for PT Legon Pari Mandiri |
February 2021 - July 2022 |
18. |
UKL-UPL Application Document Preparation Services Consent to Use Forest Area (PPPKH) for PT DMP Gold Mining Exploration Activities. Woyla Aceh Minerals (JV With PT Ayamaru Bakti Pertiwi) |
Environment Permit /UKL-UPL |
Aceh |
Kang San Lee (President Director) PT. Woyla Aceh Minerals |
July 2022 |
19. |
External Social Safeguard Monitoring (EMA) for CW - 1, 2, 3, 4A and 4B Under Flood Management in Selected River Basin Sector Project (FMSRBSP) |
External Monitoring Safeguard (EMA) |
Banten and Maluku |
Director General of Natural Resources, Ministry of PUPR-ADB |
February 2023 |
20. |
Masterplan Document Preparation Work Obi Industrial Park |
Masterplan document |
South Halmahera, North Maluku |
Masterplan Document Industrial Park |
November 2021 - February 2022 |
21. |
ADB Safeguards Training - Ministry of PUPR Design. |
Training Safeguard |
Jakarta |
Ministry of PUPR -PUPR Training |
August - December 2020 |
22. |
Engineering Services for Intermediate Exploration Project Work PT Multi Infrastructure Facilities (Persero) And PT Geo Dipa Energi (PERSERO) |
LARAP, Grievance Redress Mechanism (GRM), Stakeholders Engagement Plan (SEP), Environmental Permit, Enviromental and Social Impact Assessment (ESIA) |
Jakarta |
PT GEO DIPA ENERGI (Persero) |
November 2021 |
23. |
Social Safeguard, LARAP, And Gender Responsive Analysis for Raw Water Intake and Transmission from Jatigede, System in West Java Province |
LARP & DPPT |
Cirebon and Sumedang |
Oriental Consultants Global Co., Ltd., |
April 2022 |
24. |
Training and Workshop on Procedures for Implementing Land Acquisition for Development for The Public Interest with PLN UPDL Makassar (Phase I). |
Training - Land Acquisition for Development for The Public Interest |
Makasar |
PT PLN (Persero) -UPDL Makasar |
April 2022 |
25. |
Training and Workshop on Procedures for Organizing Land Acquisition for Development for The Public Interest with PLN UPDL Bogor . |
Training - Land Acquisition for Development for The Public Interest |
Makasar |
PT PLN (ersero) -UPDL Bogor |
April 2022 |
26. |
Training and Workshop on Procedures for Organizing Land Acquisition for Development for The Public Interest with PLN UPDL Jakarta. |
Training - Land Acquisition for Development for The Public Interest |
Jakarta |
PT PLN (ersero) -UPDL Jakarta |
April 2022 |
27. |
Training and Workshop on Procedures for Organizing Land Acquisition for Development for The Public Interest with PLN UPDL Padang. |
Training - Land Acquisition for Development for The Public Interest |
Field |
PT PLN (ersero) -UPDL Padang |
April 2022 |
28. |
Environmental Audit of Citraland Lampung Residence |
EIA |
Buoys |
PT. Asenda Bangun Persada |
September 2021 -March 2022 |
29. |
Consultation Services on Socialization (Public Consultation) to Fisherman at Cirata Project (2021), IFC |
LARAP, Safeguard |
West Java |
PT Pembangkitan Jawa Bali Masdar Solar Energi |
September 2021 |
30. |
IFC Gap Fulfilment (ESIA -LARAP Study) for Pomalaa High Pressure Acid Leach Nickel Project, Indonesia |
ESIA - LARAP |
Pomalaa, South East Sulawe |
PT Hatfield Indonesia |
July 2022 |
31. |
Environment and Social Policy Assessment I the Scope Policy Based Lending Operations of KFW in Indonesia |
Safeguard |
National |
KfW CITA |
September 2021 |
32. |
Update ESIA-LARAP for PLTP Mataloko (20 MW) & Ulumbu (20 MW) Geothermal Power Plant Project - KfW Development Bank |
LARAP, Safeguard Survey, Grievance Redress Mechanism (GRM), Stakeholders Engagement Plan (SEP), Environmental Permit, Environmental and Social Impact Assessment (ESIA) |
NTT |
PT. PLN Persero, UIP Nusra |
July 2022 |
33. |
Due Diligent and LARAP Preparation for Pomalaa High Pressure Acid Leach Nickel Project, Indonesia, International Finance Corporation: IFC |
LARAP, Safeguard |
Sultra |
PT. Vale New Zealand |
April 2022 |
34. |
ADB TA-9861 INO: Sustainable Infrastructure Assistance Program Phase II - Supporting Sustainable and Universal Electricity Access Phase 2 (Subproject 3) - Environmental and Social Safeguards Firm (52152-003) JV PT Hatfield Indonesia |
LARAP, Safeguard Grievance Redress Mechanism (GRM), Stakeholders Engagement Plan (SEP), Environmental Permit, Environmental and Social Impact Assessment (ESIA) |
National |
Asia Development Bank & PLN |
September 2022 |
35. |
LARAP Preparation and Land Acquisition Implementation for Development of Endikat River Hydroelectric Power Plant (HEPP) |
LARAP, Safeguard, Grievance Redress Mechanism (GRM), Stakeholders Engagement Plan (SEP), Environmental Permit, Environmental and Social Impact Assessment (ESIA) |
Borneo, Maluku, Papua, Sulawesi |
PT Energi Banyu Kencana (EBK) is a Specialized Purpose Vehicle (SPV) of PT Energi Hijau Kencana ("Tirtagen") and InfraCo Asia Development Pte. Ltd.. |
December 2020 |
36. |
Construction Management Consultant Services for Bara Lestari Housing Development I Phase II (SPPH-11925.1) |
Construction Management |
Muara Enim Regency, South Sumatera Province |
PT. Bukit Asam, Tbk |
August 2020 |
37. |
External Monitoring Agency for Cidanau-Ciujung-Cidurian 3 CIS Core project Flood Management River Basin Sector Project |
External Monitoring Safeguard |
Banten |
Ministry of PUPR -ADB |
December 2019 |
38. |
Customer Satisfaction Survey (SKP) PDAM Tirta Khatulistiwa Pontianak |
Survey |
Kalbar |
PDAM Tirta Khatulistiwa Pontianak |
May – July 2019 |
39. |
AA-P167568-ASA-TF0A7983 - Advisory Services and Analytics-TF0A7983, Country Safeguard Framework Assessment (CSFA) & NLCs Sustainability. |
Social Safeguards
|
Jakarta |
World Bank Jakarta |
May 2022 |
40. |
AA-P167568-ASA-TF0A7983 - Advisory Services and Analytics-TF0A7983, Country Safeguard Framework Assessment (CSFA) |
Social Safeguards |
Jakarta |
World Bank Jakarta |
May 2020 |
41. |
Assessment of Prospective BSPS Activities Assistance Personnel in West Java province and Banten province |
Assessment |
Bandung |
Satker Provision of Self-Help Houses |
April 2018 |
42. |
Preparation of LARAP ( Land Acquisition and Resettlement Action Plan) JORR Expressway Tol Road Jatiasih-Ulujami Segment |
LARAP, Grievance Redress Mechanism (GRM), Stakeholders Engagement Plan (SEP), Environmental Permit, Environmental and Social Impact Assessment (ESIA) |
Bekasi, Jakarta |
PT. Karsa Buana Lestari |
June 19, 2019 |
43. |
TA-8484 INO: Sustainable Infrastructure Assistance Program - Technical Assistance Cluster Management Facility (Subproject 1) - Capacity Development Specialist (46380-003) |
LARAP, Grievance Redress Mechanism (GRM), Stakeholders Engagement Plan (SEP), Environmental Permit, Environmental and Social Impact Assessment (ESIA) |
National |
Asia Development Bank (ADB) |
June 13, 2019 |
44. |
Land Acquisition and Resettlement Action Plan (LARAP) Poko Hydro Electric Power Plant), World Bank |
LARAP, Grievance Redress Mechanism (GRM), Stakeholders Engagement Plan (SEP), Environmental Permit, Environmental and Social Impact Assessment (ESIA) |
Mamasa (West Sulawesi) and Pinrang (South Sulawesi) |
PLN and World Bank |
31 December 2019 |
45. |
Consultancy Services for Development of land Acquisition Planning Document (DPPT) Manual and SOP (Standard Operation Procedure) for Preparation Phase |
LARAP, Grievance Redress Mechanism (GRM), Stakeholders Engagement Plan (SEP), Environmental Permit, Environmental and Social Impact Assessment (ESIA) |
Jakarta |
Japan International Cooperation Agency Indonesia Office |
October – December 2018 |
46. |
Regional Roads Development Project (RRDP) External Monitoring Agency (EMA) |
External Monitoring Safeguard |
Central Java, East Java, West Kalimantan, North Kalimantan |
Renardet S.A |
March – July 2018 |
47. |
Research and Survey Panel Services |
Survey |
National |
PT. Palladium International Indonesia |
July – September 2018 |
48. |
Studi Ketahanan Ekonomi Perempuan Muda/ Multi-Project Research YEE on Young Women’s Economic Empowerment Security |
Penelitian, Studi |
Jawa Tengah, Jawa Timur, NTT dan Jabodetabek |
Plan International Inc. |
31 October 2016 |
49. |
TA-6293 REG: Managing the Cities in Asia - INO: Balikpapan Sanitation Project & Palembang Road Improvement Project PFS Review and Update (Social) (39185-012) (TA 6293 REG-INO) |
LARAP, Stakeholders Engagement Plan (SEP), Environmental and Social Impact Assessment (ESIA) |
Makasar dan Palembang |
Asia Development Bank (ADB) |
December 2017 |
50. |
TA-8661 INO: Stepping Up Investments for Growth Acceleration Program Subprogram 2 - Land Acquisition/Resettlement Capacity Building Specialist (48134-004) |
LARAP, Grievance Redress Mechanism (GRM), Stakeholders Engagement Plan (SEP), Environmental Permit, Environmental and Social Impact Assessment (ESIA) |
Nasional |
Asia Development Bank (ADB) |
April 2017 |
51. |
Pengembangan Sektor Perikanan Darat untuk Peningkatan Ekonomi yang Berkelanjutan. |
Pendampin dan Bimtek |
Jambi |
MCA-Indonesia |
Desember 2017 |
52. |
Household survey and focus group discussion for PISP project evaluation |
Penelitian, Studi |
Lampung, Jawa barat, Jawa Tengah, Jawa Timur |
IOB – Ministry of Foreign Affair of The Netherland Government |
June - December 2015 |
53. |
Socioeconomic and Willingness to Connect and To Pay Survey in Bekasi City for Sewerage System Development Project (SSDP). |
Survey |
Bekasi, Mataram and Banda Aceh |
PT Osana International Indonesia under project of SSDP |
November - December 2017 |
54. |
The Data Gathering Survey Work on Cities for JICA Project on “Building Disaster and Climate Resilient Cities in ASEAN” in Indonesia, JICA |
Survey |
Bitung, Ambon, Bandar Lampung, Semarang, Gorontalo, Bima, Samarinda, Aceh and Denpasar |
Japan International Cooperation Agency (JICA) |
December 2015 - February 2016 |
55. |
TA-8484 INO: Sustainable Infrastructure Assistance Program - Technical Assistance Cluster Management Facility (Subproject 1) - Capacity Development Specialist (46380-003) |
Capacity Building -Social Safeguards |
Jakarta |
CLIENT: ADB-IRM |
April 2016 |
56. |
Household Survey and Focus Group Discussion for PISP Project Evaluation funded by Ministry of Foreign Affair of The Netherland Government |
Survey |
West Kalimantan, Nusa Tenggara Timur and Central Sulawesi |
IOB - Ministry of Foreign Affair of The Netherland Government |
April - June 2015 |